DOCUMENTED only — no MEASURED result yet for this asset

EVE Energy Debrecen

Partially measurable - some real constraint on polygon/coverage/country access

FieldValue
CountryHU
Declared capex€1,350,000,000
Declared capacity30 GWh (fase 1), suministra a BMW Neue Klasse
Declared datepermiso de construcción 2025-03
Declared sourcehttps://fuelcellsworks.com (jul-2026); hipa.hu (2026-07)
Documented status (press)En plazo - obra estructural completada fin-2025, producción prevista 2027
Documented sourcefuelcellsworks.com (2026-07)
Measurability verdictPARCIAL

Regulatory/contract signal (new MVP, blind-tested 5/5 across independent cases — a different method than the satellite one above):

FieldValue
StagePRE_PRODUCTION_ACTIVITY — Active job postings + regulatory activity - factory-specific construction contract not confirmed
Regulatory/municipal milestones found3
Factory-building construction contractnot found/confirmed
Infrastructure contract (park/utilities — never counted as factory progress)not found/not applicable
Employment signalactive_postings — Portal de carreras propio real (karrier.evepower.hu); articulo de ene-2026 declara que la fabrica podria arrancar produccion con 'mil trabaj…

Source of this research round: catalog-extension-2026-09-06. Full method and its 5/5 blind-test result: china_industrial_reality — regulatory signal MVP.

Machine-readable record (same fields as this page):

eve-energy-debrecen.json

DOCUMENTED = declared by the company/press, never measured by NKO. MEASURED = NKO's own physical measurement (LiDAR/Sentinel). Never mixed without marking which is which. Method status: china_industrial_reality product page.