CALIBRATION FAILED - no volume result
South Side Landfill Inc. (IN)
A real measurement was attempted between two independent LiDAR epochs at this site, but the stable-terrain calibration ring did not pass the pre-registered alignment thresholds - so no volume change is reported. This is a real, evidenced non-result, not a missing measurement.
| Field | Value |
|---|---|
| Verdict | DETECTED_BUT_TOO_UNCERTAIN_TO_ACT_ON |
| Confidence | 0.141 |
| Epochs | 2011 → 2016 |
| Stable-control offset | 0.0483 m |
| Stable-control sigma | 0.0482 m |
| Reason | uncertainty_m3/|volume_change_m3| > 0.5 - señal detectada pero demasiado incierta para ser accionable |
| Recommended next action | Signal detected but not decisive - consider a re-measurement once a denser/more recent public LiDAR epoch becomes available for this site. |
Machine-readable measurement (full evidence, same numbers as this page):
lmop-1939.json
Method: measure_physical_change() — same unmodified function used across every site in this program, real LiDAR/3DEP epochs via the public hobuinc/usgs-lidar EPT index, calibrated against a stable-terrain control ring. Synthetic 200x200m buffer on the LMOP-declared coordinate — never the legal parcel boundary. Full method: /products/physical-change/.